2 - GETTING STARTED
2.1 - Front panel
Legend1 Report LEDs
2 Touchscreen color display
3 On/Off switch
4 Dedicated CVIPC Ethernet port + USB port
| LED color | Designation | Action |
|---|---|---|
| Green | Accept report | - |
| Yellow | Incomplete rundown | Tighten again |
| Red & Yellow | Reject rundown | Loosen & Tighten again |
| Red | Above High Angle | Remove and replace fastener |
2.2 - Bottom panel
| No. | Description |
|---|---|
| 1 | Ethernet port dedicated only to CVIPC |
| 2 | USB port for data transfer/frmware updating/access control management |
| 3 | ePOD port for controller backup, memory extension, customer features activation |
Refer to "APPENDIX - CVI3 CONNECTIONS"
to get more information about connections
schematics.
2.3 - Dimensions
2.4 - On receiving the controller
- Check the following items are included in the kit supplied with the controller
1 Safety booklet
2 Quick start user manual
3 CDROM
4 2 cable clamps
- Check the line voltage and power are compatible with your appliance: 85–125VAC/180–265VAC single phase with automatic switching voltage between 110 and 230 VAC. Frequency is 50/60 Hz.
- Check the Quick Stop contact (pin J17-4) is correctly wired on the I/O connector: it can be a strap between pin J17-4 and J17-2 or a connection to a PLC or a push-button
The opening of the Quick Stop contact disables the power circuit.• Switch on the GFI (see 1 hereafter)
• Connect the tool.
• Connect the power supply cable on the mains (2)
• Press the On/Off switch on the front panel to power on the controller
The front panel LEDs are blinking and the screen to select the
language is displayed:
- Select your language by tapping the screen or the arrows.
- Tap the "Save" icon on the bottom right to save and quit the screen.
3 - TREE VIEW
3.1 - Main menu/Confguration
3.2 - Main menu/Maintenance
4 - CONTROLLER SETTING
4.1 - Using icons
4.2 - Language
Path: Main menu/Confguration/Controller/User interface
- Select another language.
- Tap the "Save" icon on the bottom right to save and quit the screen
4.3 - Display
Path: Main menu/Confguration/Controller/User interface
- Select torque and speed units:
- Speed rpm/%
- Tick "Keypad beep enabled" if required.
- Tick "Backlight auto off": the screen will be automatically turned off after the timeout and turned on when the screen is touched.
- Select the screen "Back light timeout" from 1 to 59 min. (15 by default)
- Tap the "Save" icon to save and quit the screen
4.4 - Date & time
Path: Main menu/Confguration/Controller/User interface
- Tap the current date and time to display the time keyboard.
- Select year/month/day and time.
- Select " Date/time syn source" to select the source of date/ time synchronization.
- Tap the "Save" icon to save and quit the screen.
4.5 - Access manager
Path: Main menu/Confguration/Controller
It is recommended to protect the controller parameters against hazardous changes.
- Plug in a USB key on the front panel port with suffcient access rights to turn on / off the "Access control". When the key is unplugged, the access to the programming screens is locked.
- Return to the controller screen and select "Enable Access Manager" if you want the user to display the screens without modifying them.
- Tick "Lock screen enabled" to lock the screen in Monitoring views. The icon "Screen locked" will be then displayed.
4.6 - Networks
- Type the Network name (up to 40 characters).
- Enter the IP address, Subnet mask and Gateway parameters.
- Tap the "Save" icon to save and quit the screen.
4.7 - Fieldbus
Path: Main menu/Confguration/Controller/Peripherals
- Fill in the screens according to the selected Fieldbus module:
- CC Link
- Device net
- Ethernet IP
- Modbus TCP
- Profbus
- Profnet
We recommend you to use the "Fieldbus mapper" software to set the parameters.
















0 Comments